Eurovek , Inc.

Eurovek , Inc.
5/F B & P Building
843 A.Arnaiz Avenue,
Makati City , Manila
Philippines

ph: (63 2) 8150191/92
fax: (63 2) 812-0912

info@eurovek.com

  • Home
  • Building SystemClick to open the Building System menu
    • VEKA PVC WINDOW SYSTEM
    • REHAU VACUCLEAN
  • Piping SystemClick to open the Piping System menu
    • WELL SYSTEM
    • PLASTHERM PPR PIPES
    • REHAU RAUPIANO PIPES
  • Technical Services
  • FORMWORKS SYSTEM
  • About Us
  • OFFICERS
  • Contact Us
  • JOB VACANCIES

Eurovek uPVC Deepwell Casing, Screen Pipes and Sure-Loc PVC Column Riser Pipes

 

 

 

 

Eurovek uPVC Well Casing and Screen Pipes are manufactured in accordance with DIN4925 German Standards the wall thickness conforms to SDR 17 or schedule 80. It is manufactured from good quality uPVC compound under strict quality control. They are 1/5 of the weight of steel and are manufactured in convenient length of 4 meters with socket threads for easy and quick jointing.

 

Advantages:

  • Corrosion-free /Non-toxic.
  • Non Conductive / Long-life.
  • Light Weight.
  • More Permeability / Less Draw-down.
  • Saves-energy / Cost - effective.
  • High Collapse Resistance and Tensile Strength.
  • Easy - installation.
  • Protects- environments.

Accessories:

Accessories such as reducers, centering guides, conical end plugs and threaded adaptors, is manufactured to match Eurovek uPVC Well Casing and Screen pipes. Special tool such as steel clamp, lifter and strap wrench are also available during installation.

Area of use:

Eurovek uPVC Well Casing and Screen pipes are best recommended for open borehole conditions with 6" inches larger diameter than the casing pipe. It is specified for wells when construction practices allow the borehole to remain open during casing installation.

Installation:

Lowering of uPVC casing and screen pipes is similar to that of mild steel pipes. However, care must be taken to ensure that pipes are perfectly upright which would ensure trouble free working of the tube well. The pipes should not be pushed or driven using external force. Keep clean and free from foreign objects.

Use backwash method while gravel packing the well. Exercise care during removal of drilling buds, during jetting and surging not create excessive differential pressures across casing.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LIST OF ACCOMPLISHED PROJECT

 

*Angeles Water District Installation*

 

Angeles Water District Installation

 

 

 

 

*Cabanatuan Water District*

 

Cabanatuan Water District

 

 

 

 

*Calumpit Installation*

 

Calumpit Installation

 

 

 

 

*Camiling Water District*

 

Camiling Water District

 

 

 

 

*Tarlac Water District*

 

Tarlac Water District

 

 

 

 

 

 

 

 

 

For more info e-mail us at wellsystem@eurovek.com

 

 

Copyright Eurovek , Inc.

Web Hosting by Turbify

Eurovek , Inc.
5/F B & P Building
843 A.Arnaiz Avenue,
Makati City , Manila
Philippines

ph: (63 2) 8150191/92
fax: (63 2) 812-0912

info@eurovek.com