Formworks System

You are here:
PIC.16514851_std
Multi System Formwork Engineering

EUROVEK FORMWORKS SYSTEM

  • Brings 20 years experience of Aluminium Formwork System in Asia, Middle East & Africa
  • Ensures quality, delivery, and economy.
  • Experience in Multi Story High End Residential
  • Experience in Major Mass Housing Project

Aluminium System Formwork

  • How it is used on site
  • Advantages of System Formwork
  • Mass Housing
  • High Rise

Lightweight but Strong

Weight 25 kilograms/m2
Withstands Pressures of 60 kN/m2

ev_formworks
Architectural & Structural Features Formed

  • klkl.16511825_std
  • stairs.16512114_std

    STAIRS

  • stairs_2.16512139_std

    STAIRS

  • ev_formworkcurve1

    CURVE Features

  • ev_formworkcurve2

    CURVE Features

  • WALLS.16513031_std

    WALLS

  • COLUMN.16513550_std

    COLUMN

  • BEAMS.16514329_std

    BEAMS

  • SLAB.16514737_std

    SLABS

  • PIC.16514851_std

    COMPLETE SYSTEM: SHEAR WALL

Floor Cycles to Meet your Project Requirements

  • 4 Days per Floor
  • 6 Days per Floor
  • 8 Days per Floor
  • 10 Days per Floor

SITE FACTORY CONCEPT
Factory production efficiency on any site anywhere
Delivery on time
Eliminates transportation costs of pre-cast
Eliminates high craneage cost of tunnel form/others
Employs local low skilled workers
Highly mobile for transfer to other sites
Multiple re-usage means unbeatable cost efficiency
Why Use Aluminum Formworks?
-Speed from a Faster Construction Programme
-Means Reduced Capital Costs
-Unskilled Labour Force
-Precise Alignment of Walls & Slabs
-No heavy bed plastering required
-Integrated Scaffolding and Work Platform